SERVICES

Full Loads (excludes Tolls)

  • Clean Concrete

    $760 ex. GST

  • Dirty Concrete

    $850 ex. GST

  • Asphalt Clean

    $650 ex. GST

  • Clean Fill

    $700 ex. GST

  • Inert Fill (Undecomposable)

    $1000 ex. GST

  • Mud/Silt

    POA

  • Green Waste

    $760 ex. GST

  • Stumps & Logs

    POA

  • Construction Waste

    $1,200 ex. GST

Grab / Tipper (excludes Tolls)

  • Grab Truck

    Per hour: $150 ex. GST
    Minimum 2 Hours: $300 ex. GST

  • Tipper Only

    Per hour: $110 ex. GST
    Minimum 2 Hours: $220 ex. GST

Tolls

  • Murrarie

    $13.87 ex. GST

  • Compton Road

    $8.18 ex. GST

  • Logan Lea

    $5.25 ex. GST

  • Heathwood

    $8.66 ex. GST

  • Paradise Road

    $8.66 ex. GST

  • Go Between Bridge

    Off Peak: $8.00 ex. GST
    Peak: $9.05 ex. GST

  • Clem 7

    Off Peak: $12.81 ex. GST
    Peak: $14.51 ex. GST

  • Legacy Way

    Off Peak: $13.82
    Peak: $15.64

  • Bowen Hill → Kedron

    $14.11 ex. GST

  • Bowen Hills → Toombul

    $14.11 ex. GST

  • Kedron → Toombul

    $10.58 ex. GST

  • Toowoomba Bypass

    $21.30 ex. GST

 

Need a quote?

Feel free to give us a call, send an email,
or use our website form!

E: info@grabittrucks.com

P:
0407 986 966