
SERVICES
Full Loads (excludes Tolls)
-
Clean Concrete
$760 ex. GST
-
Dirty Concrete
$850 ex. GST
-
Asphalt Clean
$650 ex. GST
-
Clean Fill
$700 ex. GST
-
Inert Fill (Undecomposable)
$1000 ex. GST
-
Mud/Silt
POA
-
Green Waste
$760 ex. GST
-
Stumps & Logs
POA
-
Construction Waste
$1,200 ex. GST
Grab / Tipper (excludes Tolls)
-
Grab Truck
Per hour: $150 ex. GST
Minimum 2 Hours: $300 ex. GST -
Tipper Only
Per hour: $110 ex. GST
Minimum 2 Hours: $220 ex. GST
Tolls
-
Murrarie
$13.87 ex. GST
-
Compton Road
$8.18 ex. GST
-
Logan Lea
$5.25 ex. GST
-
Heathwood
$8.66 ex. GST
-
Paradise Road
$8.66 ex. GST
-
Go Between Bridge
Off Peak: $8.00 ex. GST
Peak: $9.05 ex. GST -
Clem 7
Off Peak: $12.81 ex. GST
Peak: $14.51 ex. GST -
Legacy Way
Off Peak: $13.82
Peak: $15.64 -
Bowen Hill → Kedron
$14.11 ex. GST
-
Bowen Hills → Toombul
$14.11 ex. GST
-
Kedron → Toombul
$10.58 ex. GST
-
Toowoomba Bypass
$21.30 ex. GST

Need a quote?
Feel free to give us a call, send an email,
or use our website form!
E: info@grabittrucks.com
P: 0407 986 966
